Hardcore Sledder banner

1 - 3 of 3 Posts

·
Registered
Joined
·
129 Posts
Discussion Starter · #1 ·
i ordered a 2006 sabercat 500lx with efi was told won't be in till late october not built yet i seen 2006 600 and 700's does this sound right HHHHEEEELLLPPPP>
>>>
 

·
Premium Member
Joined
·
3,173 Posts
Originally posted by stuca@Sep 7 2005, 07:12 PM
i ordered a 2006 sabercat 500lx  with efi  was told won't be in till late october not built yet i seen 2006 600 and 700's does this sound right HHHHEEEELLLPPPP>
>>>
<div align="right">index.php?act=findpost&pid=864735
[/quote]

Probably because they are putting the finishing touches on that EFI 500 which is a first year motor. The other 2 sizes you mentioned were existing designs and already built and ready for the assembly line.
 

·
Registered
Joined
·
2,672 Posts
Yea they often build sleds first that have the fewest changes. Doing this gave them more time to get the 500 dialed in.
 
1 - 3 of 3 Posts
Top